Giant Mining Aligns with White House "America First" Strategy to Fast-Track Critical Minerals and Reshore the U.S. Copper Supply Chain
(TheNewswire)
VANCOUVER, BC — TheNewswire - July 14, 2025 — Giant Mining Corp. (CSE:BFG | OTC: BFGFF | FWB: YW5 | CSE: BFG.WT.A | CSE: BFG.WT.B) (“GiantMining” or the “Company”) and itsstakeholders at the flagship Majuba Hill Copper-Silver-Gold Project inPershing County, Nevada, fully support the U.S. Government’s renewedcommitment to fast-track permitting for critical mineral projects as amatter of national security.
Click Image To View Full Size
David Greenway,CEO of Giant Mining, commented: “The 2025 Phase 1 drilling at Majuba Hill marked a bold leapforward — our most ambitious and technically advanced campaign yet,building on the exceptional grades we achieved in 2024. Under thestrong leadership of President Trump, the United States has issued aclear call to action: secure the metals that power our energyindependence, national defense, and critical infrastructure. GiantMining stands ready to answer that call. With Majuba Hill, we areproud to lead the charge in reshoring copper production, revitalizingU.S. mining districts, and driving long-term value for shareholders— all while putting America First.”
The Company applauds the strategic initiativesannounced by President Trump’s administration, which align directlywith Giant Mining’s mission to develop secure, domestic coppersupply chains. These initiatives include:
Fast-Tracked Permitting
Following the March 20, 2025, Executive Order, copperhas been formally designated under FAST-41,significantly accelerating environmental and land-use reviews. The eraof decade-long permitting delays is ending.
Defense Production ActMobilization
The U.S. Government is deploying the Defense ProductionAct and launching new federal financing programs to expand domesticmining and reduce reliance on foreign supply—essential to nationaldefense and economic security.
Federal Prioritization ofCopper
U.S. federal agencies—including the Departments ofInterior, Defense, Energy, and Agriculture—are now activelyprioritizing the extraction of copper, rare earths, nickel, andlithium on public lands. This supports infrastructure development,clean energy initiatives, and military readiness.
Copper Tariffs to ReshoreProduction
In July 2025, the U.S. government imposed a 50% tariffon imported copper, a landmark policy designed to reduce reliance onforeign supply chains. This move made global headlines and has alreadytriggered increased domestic demand for U.S.-sourced copper. Forprojects like Majuba Hill, this policy provides direct support byincentivizing local production and reinvigorating legacy miningdistricts across the country.1
Giant Mining is proud to answer the President’s callto action — building strong, secure, and sovereign supply chainsthat support American jobs, energy independence, and economicsecurity. With President Trump’s clear directive to prioritizecritical minerals under the “America First” agenda, we arecommitted to reshoring copper production and strengthening thebackbone of the nation’s industrial future.
Project Development Update:
Giant Mining continues to advance exploration anddevelopment at Majuba Hill. The Company recently engaged RESPECEngineering to complete a NI 43-101 Mineral Resource Estimate(“MRE”) and is incorporating data from its recently completedSpring drill program. Preparations are underway for an expanded Summerdrill program, positioning the Company to apply for federal programsnow available under the U.S. government’s critical mineralinitiatives. All Assays are now pending from our Spring 2025 drillprogram with results expected imminently.
President Donald J. Trump commented:“On July 8, I made it clear: America will no longer depend on foreign nationsfor the copper that powers our economy and our national defense. Witha 50% tariff on imported copper, we are reshoring our supply chains,rebuilding American industry, and putting our workers first. This isabout sovereignty, strength, and securing our future. We’re donewith the delays — it’s time to mine and build in Americaagain.”
Majuba Hill’s critically importantcharacteristics are as follows:
Location: | Nevada, USA — a globally top-ranked miningjurisdiction, ranked #1 in the Fraser Institute’s 2022 Annual Surveyof Mining Companies. |
Project Size: | 9,684 Acres |
Infrastructure: | The Majuba Hill property is 113 road km (70 miles)southwest of Winnemucca, Nevada, and 251 km (156 miles) northeast ofReno. Access is by well-maintained county roads from the Imlay;Nevada exit on U.S. Interstate 80 and traveling westward 23 miles.People, Roads, Power and Water are the basic elements when consideringinfrastructure and Majuba Hill already has a solid infrastructurefoundation for building a large facility which will providesignificant savings compared to more remote projects |
History: | Historical Producer |
Drilling: | Approximately 89,395 feet of drilling to date. Roughreplacement value of drilling USD $12.1 Million using currentcosts. |
Mineralization: | The project shows indications of a potentially large Cu– Ag +/- Au mineralized body with many features in common with bothlarge porphyry copper, silver, and gold projects. |
Expandability: | The IP survey, deep drilling, and step-out drillingindicate significant expansion potential, with mineralization open inall directions. |
Fully Financed: | Secured funding for next phase of drilling at MajubaHill in June 2025. |
Quality Assurance/Quality Control(“QA/QC”) Measures, Chain of Custody
The Company utilizes a QA/QC program using bestindustry practices at the Majuba Hill Project. The samples are placedin cloth sample bags and are transported from the Giant Mining secure warehouse to the ALS Labs Sample Prep Facilityin Elko, Nevada. ALS Labs then securely transports the prepared pulpsto their analytical lab in North Vancouver, B.C.
Drill core samples are sawn in half lengthwise and onehalf is placed in labeled cloth sample bags. All samples are analyzedfor copper, gold, silver, and 33 other elements. Gold is determined byALS Labs method Au-AA23 which is a fire assay with an AAS finish on a30-gram split. Copper, silver, and the remaining 31 elements aredetermined by ALS Labs method ME-ICP61 which is a four-acid digestionand ICP-AES assay. Approximately 5% of the submitted samples are drillduplicates and copper-gold-porphyry commercial standard referencematerial pulps. The remaining pulps will be retrieved from ALSLabs.
Qualified Person
The scientific and technical information contained inthis news release has been reviewed and approved by E.L. “Buster”Hunsaker III, CPG 8137, a non-independent consulting geologist who isa “Qualified Person” as such term is defined under National Instrument 43-101 – Standardsof Disclosure for Mineral Projects (“NI 43-101”).
About Giant Mining Corp.
Giant Mining is focused on identifying, acquiring, andadvancing late-stage copper and copper/silver/gold projects to meetthe growing global demand for critical metals. This demand is drivenby initiatives like the Green New Deal in the United States andsimilar climate-focused programs worldwide, which require substantialamounts of copper, silver, and gold for electric vehicles, renewableenergy infrastructure, and the modernization of clean and affordableenergy systems.
The Company’s flagship asset is the Majuba HillCopper, Silver, and Gold District, located 156 miles (251 km) fromReno, Nevada. Majuba Hill is situated in a mining-friendlyjurisdiction with supportive regulations and has the potential tobecome one of the next major copper deposits, critical for meeting theincreasing need for this red metal.
Neither the Canadian SecuritiesExchange nor its Market Regulator (as that term is defined in thepolicies of the Canadian Securities Exchange) accepts responsibilityfor the adequacy or accuracy of this release.
On Behalf of the Board of Giant Mining Corp.
“David Greenway”
David C. Greenway
President & CEO
For further information, please contact:
E: info@giantminingcorp.com
P: 1 (236) 788-0643
VISIT OUR WEBSITE FOR MORE DETAILS
www.giantminingcorp.com
LIKE AND FOLLOW
Instagram, Facebook, Twitter, LinkedIn
DOWNLOAD INVESTOR INFORMATION
Click Here
Forward-Looking Statements
This news release contains certain
forward‐looking information. Such information
involves known and unknown risks, uncertainties and other factors that
may cause actual results, performance or achievements to be materially
different from those implied by statements herein, and therefore these
statements should not be read as guarantees of future performance or
results. All forward‐looking statements are
based on the Company’s current beliefs as well as assumptions made
by and information currently available to it as well as other factors.
Readers are cautioned not to place undue reliance on these
forward‐looking statements, which speak only as of
the date of this press release. Due to risks and uncertainties,
including the risks and uncertainties identified by the Company in its
public securities filings, actual events may differ materially from
current expectations. The Company disclaims any intention or
obligation to update or revise any forward‐looking statements, whether as a result of new information, future
events or otherwise.
###
1 Source: U.S. Department of Commerce announcement, July 2025;reported by Reuters and AmericanProgress.org.
Copyright (c) 2025 TheNewswire - All rights reserved.